KAFA Integrasi, Puchong Perdana

About

Faced with a growing student population, the school board sought to expand its facilities with additional classrooms that could transform into a school hall

To maximize their limited land space, we provided an ingenious solution by adding an extra floor to an existing building. Utilizing our innovative IBS steel frame system with drywall finishes, we delivered a cost-effective and timely solution without sacrificing safety or student comfort. Our modern construction approach ensures that students continue to learn in a secure and convenient environment.

Size Location Year
3900 sqft Puchong, Selangor 2021